Project Track Record | Feature Projects

Selected List of Completed and On-Going Projects: Page  [1]  2


Contract 3214 - Proposed Queensway/Commonwealth Avenue Road Interchange

Geotechnical Instrumentation, within MRT 1st Reserved (Diaphragm wall excavation). 23 sets of inclinometers, piezometer and water standpipes in soil and in wall. VW strain gauges, tiltplates, prisms on viaduct, settlement markers on service road.

   

Earth Works for Slope Repair (Part 1) at Bukit Batok Neighbourhood 2 Contract 12 (2002 - 2004)

Supply and commission real time remote monitoring for slope stability, including in-place inclinometers.

   

6 Storey Commercial Building with 2 Storey Basement at Tekka Corner (2000 – 2003)

Geotechnical instrumentation and monitoring.

   

Contract 3214 – Proposed Queensway/Commonwealth Avenue Road Interchange – Deep Excavation and Diaphragm Wall Construction (2002 - 2005)

Geotechnical instrumentation and monitoring of ground movement and strut deformation.

   

LTA Circle Line 3 - C853A Bishan Interchange Station (2004 - 2007)

  • Station and A&A works instrumentation monitoring works
  • Automatic Real Time Monitoring for Bishan Station track and platform
   

SOHO at Clarke Quay MRT Station

Geotechnical instrumentation monitoring works on top and adjacent to existing MRT station/tunnels, including Automatic Real Time Monitoring for MRT tunnels.

   

Mount Sophia 8 Condominium Residential Development

  • 13 nos. Inclinometers
  • 6 nos. Piezometers
  • Instrumented Rings with VW strain gauges for ground anchors
   

PUB – DTSS Bedok Link Sewers – Pipe Jacking / Receiving 20m Deep Shaft’s Excavation with Struting and Micro-Tunneling Works (2004 - 2007)

  • Geotechnical instrumentation and monitoring
  • Additional soil investigation works
   

CitySquare Residence Residential Development at Kitchener Road (2005 - 2006)

  • Geotechnical instrumentation monitoring works for 130m diameter circular cofferdam excavation. Including Automatic Real Time Monitoring for concrete ring beams.
  • Additional soil investigation works
   

LTA Circle Line Stage 3 C853: Marynount Station Including Tunnels (2003 - 2006)

Geotechnical instrumentation monitoring works for tunnellling and underground construction works. Including Automatic Real Time Monitoring for struts.



Page  [1]  2