S/N |
Name of Project and Location |
Contract Period |
Ultimate Client |
1 |
Contract 3214: Proposed Queensway/Commonwealth
Avenue Road Interchange
Geotechnical Instrumentation, PDA test and Soil Investigation
within MRT 1st Reserved (Diaphragm wall excavation) |
01 Jul 2001 to 12 Jun 2005 |
LTA |
2 |
Project: PUB – DTSS Bedok Link Sewers
Geotechnical Instrumentation Works. MRT structures survey |
30 Jun 2002 to 24 Jun 2006 |
PUB |
3 |
LTA Circle Line 3: C853A Bishan Interchange
Station
Geotechnical and tunnel monitoring
Recharge well installation |
20 Dec 2003 to 01 Dec 2006 |
LTA |
4 |
LTA Circle Line 3: C853 From Bartley to Marymount
Geotechnical and tunnel monitoring
Additional soil investigation works
Recharge wells installation |
20 Dec 2003 to 01 Dec 2006 |
LTA |
5 |
The Icon Condominium
Instrumentation Works |
20 Dec 2003 to 15 Dec 2005 |
Private |
6 |
Miltonia Close Condominium at Yishun Ave
Instrumentation works |
15 May 2004 to 15 May 2006 |
Private |
7 |
Baywater Condominium Bedok Reservoir Road
Instrumentation and soil investigation works |
20 Mar 2004 to 20 Mar 2005 |
Private |
8 |
Central Clarke Quay
SOHO Development Above Existing Clarke Quay MRT Station
Instrumentation Works |
01 Jul 2004 to 30 June 2007 |
Private |
9 |
Mount Sophia Condominium Development
Instrumentation works including real time tunnel monitoring
Soil investigation works |
15 Jun 2004 to 15 Jun 2007 |
Private |
10 |
Contract 8242Supply, installation, maintenance,
and monitoring of instrumentation equipment for Contract 856
Instrumentation works including real time strut load, total
station prism on vehicular bridges and tunnel monitoring |
07 Jan 2005 to 28 Feb 2008 |
LTA |
11 |
Proposed Bulk Liquid Products
Terminal on Jurong Island, Singapore
Soil investigation, CPT, laboratory test
Instrumentation works |
15 Mar 05 to 01 Sep 06 |
JTC |
12 |
Contract C856 – Circle Line Stage 4&5
Additional soil investigation works |
05 Jul 2005 to 15 Aug 2007 |
LTA |
13 |
The Sail at Marina – Residential Development
Instrumentation works |
03 May 2005 to Sep 2006 |
Private |
14 |
CitySquare Residential Development at Kitcherner
Road
Instrumentation and monitoring Works |
05 Jun 2005 to 05 Aug 2006 |
Private |
15 |
Varsity Park Residential Development at Clementi/West
Coast Road
Instrumentation and monitoring Works |
05 May 2005 to 09 Aug 2006 |
Private |