S/N |
Name of Project and Location |
Contract Period |
Ultimate Client |
1 |
Specialized Laboratory Testing of Modelled
Rock Materials for the Feasibility Study of the Underground
Science City to the School of CSE, NTU |
24 Jun 2000 to 25 Sep 2000 |
NTU |
2 |
Power Grid Transmission Cable Tunnels, Tunnels
2: Ayer Rajah to Paya Lebar – Ground Investigation (G1-1
& G1-2) |
20 May 2000 to 13 Feb 2002 |
Power
Grid |
3 |
LTA Contract 4905: Seismic Refraction Survey
at Paya Lebar Road |
15 May 2001 to 12 Jun 2001 |
LTA |
4 |
Extension and Widening of Upper Serangoon
Road from Hougang Ave. 5 to Sengkang New Town and New Arterial
Road from Ponggol Road to Upper Serangoon Road Extension
Geotechnical Instrumentation Works |
12 Mar 2001 to 12 Sep 2001 |
LTA |
5 |
NTU Phase 3B Development at Nanyang Technology
University: Underground Driveway Excavation
Geotechnical Instrumentation |
15 Mar 2001 to 23 Sep 2001 |
NTU/ PWD Consultants |
6 |
Proposed Earth Works, Roads, Drains, Sewers
and Ancillary Works at Changi North Bay – Phase 2
Geotechnical Instrumentation |
02 May 2001 to 31 Dec 2001 |
JTC |
7 |
Seismic Survey and Borehole Geophysical Logging
at Jurong Island
Site investigation, seismic survey, borehole radar and rock
testing |
20 Sep 2001 to 20 Mar 2002 |
JTC |
8 |
Proposed Widening of BKE from SLE to KJE:
Soil Investigation Works |
15 Jan 2002 to 10 Mar 2002 |
LTA |
9 |
Design And Construction Of The Deep Tunnel
Sewerage System (DTSS) Contract T-05 Kranji Tunnel: Ch 388
to 947 Seismic Reflection Survey |
25 Feb 2002 to 15 Mar 2002 |
PUB |
10 |
Proposed Condominium at Ladyhill Road (Former
Ladyhill Hotel)
Geotechnical Instrumentation Works |
26 Feb 2001 to 25 May 2002 |
Private Project |
11 |
Contract 3214: Proposed Queensway/Commonwealth
Avenue Road Interchange
Site Survey, Instrumentation, PDA test, plate loading test
and Soil Investigation |
10 Apr 2001 to 12 Jun 2002 |
LTA |
12 |
Buangkok Green From Hougang Ave 4 to Buangkok
Drive 2
Soil investigation and Geotechnical Instrumentation |
10 Oct 2001 to 10 May 2002 |
LTA |
13 |
Project: PUB – DTSS Bedok Link Sewers
Seismic Refraction Survey |
15 Aug 2002 to 15 Sep 2002 |
PUB |
14 |
Soil Investigation for Public Utilities Board
(Phase 1)
Soil investigation, seismic refraction survey, electrical
resistivity survey |
05 Jun 2002 to 05 Dec 2002 |
PUB |
15 |
Project: PUB – Rehabilitation &
Replacement of Pumping Mains – Contract 3
Soil investigation including cable detection and reinstatement
works |
21 Jun 2002 to 20 Sep 2002 |
PUB |
16 |
LTA Contract 825 – Circle Line 1
Seismic Reflection and Electrical Resistivity Survey and
Soil Investigation |
30 Aug 2002 to 29 Nov 2002 |
LTA |
17 |
Proposed Retail Development at Tekka Corner
at Serangoon Road
Geotechnical Instrumentation and vibration monitoring |
02 Feb 2001 to 31 May2003 |
Private Project |