CIVIL and STRUCTURAL DIVISION
Civil & Structural Division is formed by a group of competent and enthusiastic professional engineers, design engineers, resident engineers, site supervisors and technical staff. Besides meeting tight project schedule, budget and quality standard, our professional staff is also committed to produce value engineering, cost effective and constructible design for our clients.
Our professional staff has extensive industrial experiences in designing major civil infrastructure works, full range of buildings including structures in earthquake zone, mixed development, coastal engineering development and temporary earth retaining structures.
We provide full spectrum of consultancy services including:
A. General Scope
- Civil and structural consultancy services
- QP Supervision
- Construction Supervision
- Project Management
- Contract Administration
B. Civil and Structural Consultancy
- Major Civil Infrastructure Works
- Building Design and Analysis
- Structures in earthquake zone
- Temporary Earth Retaining Structures
- Structural Appraisal/Assessment
Continuing advancement and upgrading through latest technologies and researches are our missions to provide best services to our clients.
Projects Involved for C&S Consultancy Services:
Improvement to Bukit Timah Canal near Maple Avenue
This project involves the deepening and widening of Bukit Timah canal from Jalan Kampong Chantek to Maple Avenue. The works include the re-construction of canals, culverts and flood gates.
Our services include:
- Design of civil/structural works
- Preparation of specification and tender documents
- Calling of tender and evaluation
- Project management and contract administration
- Submission for approval from authorities
- Supervision of civil/structural works by qualified person
- Inspection and supervision of all site works by site supervisors (RE/RTO)
- Review of design documents and method statements

Improvement to Drains in Syed Alwi Road Areas
The project involves improvement to drains in Syed Alwi Road area including Serangoon Road, Lembu Road, Kampong Kapor Road, Jalan Besar, Townshend Road and King George’s Road.by constructing wider and deeper drains and culverts and raising the road levels and drains.
Our services include:
- Design of civil/structural works
- Preparation of specification and tender documents
- Calling of tender and evaluation
- Project management and contract administration
- Submission for approval from authorities
- Supervision of civil/structural works by qualified person
- Inspection and supervision of all site works by site supervisors (RE/RTO)
- Review of design documents and method statements

Improvement to Roadside Drain Batch 1A
The project involves the improvement to roadside drains in Tembeling Road / Duku Road, Mayflower Road/Ang Mo Kio Ave 3, Lorong 102~106 Changi Road and Frankel Estates. The work comprises the construction of drains and culverts and road-raising.
Our services include:
- Design of civil/structural works
- Preparation of specification and tender documents
- Calling of tender and evaluation
- Project management and contract administration
- Submission for approval from authorities
- Supervision of civil/structural works by qualified person
- Inspection and supervision of all site works by site supervisors (RE/RTO)
- Review of design documents and method statements

Improvement to Roadside Drain Batch 1B
The project involves the improvement to roadside drains at Hua Guan Avenue/Sian Tuan Avenue, Jalan Ma’mor/Jalan Tenteram, Tembeling Road/Ceylon Road, Outram Road, Tiong Bahru Road, Dunearn Road/Hillcrest Road, Derbyshire Road, Owen Road/Dorset Road. The work comprises the construction of drains and culverts and road-raising.
Our services include:
- Design of civil/structural works
- Preparation of specification and tender documents
- Calling of tender and evaluation
- Project management and contract administration
- Submission for approval from authorities
- Supervision of civil/structural works by qualified person
- Inspection and supervision of all site works by site supervisors (RE/RTO)
- Review of design documents and method statements

Demolition of Pumping Stations (Package B) – Contracts 1 and 2
Contract 1 includes demolition of the Braddell, Serangoon Garden and Sembawang Hill Pumping Stations. Works just beyond the site boundary of the Braddell Pumping Station include grouting of abandoned sewer lines, laying of new sewer pipes, and construction of new manholes. Demolition works include removal of all super and sub-structures, plugging/ sealing off all abandoned services at the sites’ boundaries.
Contract 2 includes demolition of the Crawford and Ang Mo Kio North Pumping Stations, laying of new sewer lines at the Crawford Pumping Station, and grouting of abandoned sewers at Crawford, Ang Mo Kio, Sembawang Hill and Serangoon Garden. Demolition works include removal of all super and sub-structures and plugging/ sealing off all abandoned services at the sites’ boundaries. There will also be construction of new a new manhole, 2 vortex chambers and laying of new sewer pipes outside the Crawford Pumping Station boundary to connect to existing sewers.

Projects Involved for QP Supervision:
LTA CONTRACT ER251QP FOR PROJECT– UPGRADING OF ROAD SYSTEM IN THE SENTOSA-HARBOUR FRONT AREA FROM KAMPONG BAHRU ROAD TO HENDERSON ROAD (PROJECT COMPLETED ON 01 FEBRURAY 2010)
Design and construction of a new vehicular up-ramp structure from eastbound Telok Blangah Road after Wishart Road to the Telok Blangah viaduct with associated structural modifications and road widening works.
The scopes of QP(S) include:
- Provide Qualified Person for supervision of civil/structural works
- Provide site supervisors i.e. RE/RTOs for inspection and supervision of all site works
- Review and comment the design documents and method statements

LTA C1590QP FOR PROJECT – DESIGN AND CONSTRUCTION OF STATION AND VIADUCT FOR JURONG EAST MODIFICATION WORKS (ON GOING PROJECT)
The project comprises the design, construction and completion of an above ground platform station extension adjacent to the existing Jurong East MRT Station and a route length of 1.65km viaduct, including a special superstructure spanning across N-S line, the ancillary structures and external works.
The scopes of QP(S) include:
- Provide Qualified Person for supervision of civil/structural works
- Provide site supervisors i.e. RE/RTOs for inspection and supervision of all site works
- Review and comment the design documents and method statements

LTA CONTRACT ER285QP FOR PROJECT – WIDENING OF CTE FROM BRADDELL ROAD TO ANG MO KIO AVE1 (ON GOING PROJECT)
The project comprises widening of the existing ANG Mo Kio South Flyover structure, vehicular bridge over the canal between Braddell Flyover and Ang Mo Kio South Flyover and existing road widening including all the ancillary RC structure like box culvert as well as all the other works along the certre-median and the side-tables.
The scopes of QP(S) include:
- Provide Qualified Person for supervision of civil/structural works
- Provide site supervisors i.e. RE/RTOs for inspection and supervision of all site works
- Review and comment the design documents and method statements

LTA CONTRACT ER286QP FOR PROJECT – WIDENING OF CTE FROM ANG MO KIO AVE3 TO YIO CHU KANG ROAD (ON GOING PROJECT)
The project comprises widening of the existing Ang Mo Kio North Flyover and Ang Mo Kio Central Flyover structure, extension of existing pedestrians underpass with covered ramps, and existing road widening including all the ancillary RC structure like box culvert /covered drains as well as all the other works along the certre-median and the side-tables.
The scopes of QP(S) include:
- Provide Qualified Person for supervision of civil/structural works
- Provide site supervisors i.e. RE/RTOs for inspection and supervision of all site works
- Review and comment the design documents and method statements

LTA CONTRACT ER299QP FOR PROJECT– DESIGN AND CONSTRUCTION OF 6-STOREY TRANSMISSION SUBSTATION NEXT TO PSA KEPPEL DITRIPARK (ON GOING PROJECT)
The project comprises construction of 6-storey transmission substation with associated of all other works including drains, culvert, sumps, retaining wall, slope stabilization, soil nail and all other structures required for the completion of the works.
The scopes of QP(S) include:
- Provide Qualified Person for supervision of civil/structural works
- Provide site supervisors i.e. RE/RTOs for inspection and supervision of all site works
- Review and comment the design documents and method statements