Featured Projects
Contract 9053 – Advance Earthwork at Downtown Line Depot
What we do:
Design and supervision of the TERS works (46m height open cut slope design)
JTC Underground Storage
Proposed Jurong Rock Cavern at Banyan Basin, Jurong Island.
What we do:
Provision of Project Management, Technical Advice
LTA DTL2 C921QP Little India and Rochor Station/ Tunneling works
Design and Construction of Stations and Tunnels at Rochor and Little India for Down
Projects Involved
ERSS design for commercial/residential projects
- Blossoms Condo at Woodleigh Close
- City Square at Kitchener Road
- Detached Dwelling House at Queen Astrid Park
- D Lotus Condominium at Lorong Ampas
- Extension of Holland Residence
- Hilltops Condo at Cairhill Circle
- Holland Residence at Taman Warna
- Hydrogeological Field Exploration
- IR Sands at Marina Bay
- MBFC A2 and A4 at Marina Bay
- MBFC R1 at Marina Bay
- MBFC R2 at Marina Bay
- Mi-Casa Condo at Choa Chu Kang Drive
- Proposed condominium housing development at the Ladyhill
- Quayside Condo at Ocean Way
- Quatside Hotel at Ocean Way
- The Civics & Cultural Centre (CCRC) at Buona Vista
- The Icon Condominium at Gopeng Street
- The Miltonia Condominium Development
- The Overseas Union House
- The SAGE at Nassim Road
- The Sail at Marina Bay
- The Savannah Condo Park
- Tribeca at Kim Seng Road
- Varsity Park at Clementi /West Coast Road
- Volarie Condo at Balmoral Road
- D'Leedon at Farrer Road
- Cube-8 at Thompson Road
- UPS
ERSS design for PUB project
- Construction of New Powergrid 400kV Substation at Ubi Ave 3
- DTSS- Bedok Link Sewers
- Improvement to Joan Road Outlet Drain
- ISHI POWER – Power Plant Foundation Failure at Tanjong Bin, Johor
- Newater Infrastructure Plan (NIP) Contract 6
- Newater Infrastructure Plan (NIP) Contract 9
- Replacement of Industrial Water Mains – Phase 3
- Extension of Industrial Water Network to Jurong Island Contract 1A
ERSS design for LTA project
- Contract 9053 – Advance Earthwork at Downtown Line Depot
- Fort Canning Hill – NATM Excavation
- MRT C856- D-Wall Analysis
- MRT Circle Line Stage 3 – C853 Tunnelling Works
- T05 Tunnel Stability
Project management and site supervision
- JTC Underground storage
- LTA DTL1 - C902QP Promenade Station/Tunneling Works
- LTA DTL2 C921QP Little India and Rochor Station/ Tunneling works
Environmental and Geotechnical Baseline Study
Feasibility Study and Infrastructure Planning
- Infrastructure Masterplanning for Tuy Hoa South City, Capital of Phu Yen, Vietnam