Featured Projects

Contract 9053 – Advance Earthwork at Downtown Line Depot What we do: Design and supervision of the TERS works (46m height open cut slope design)
JTC Underground Storage Proposed Jurong Rock Cavern at Banyan Basin, Jurong Island. What we do: Provision of Project Management, Technical Advice
LTA DTL2 C921QP Little India and Rochor Station/ Tunneling works Design and Construction of Stations and Tunnels at Rochor and Little India for Down

Hilltops Condo at Cairhill Circle

Proposed Condominium Development Consisting a 20-Storey Block and a 14-Storey Block with 2 Nos. of Sky Terraces, 2 Basement Carparks, Swimming Pool & Communal Facilities at Cairhill Circle

What we do:

  • Design of CBP as temporary earth retaining system for a basement excavation
  • Design of soil nails as temporary earth retaining system for an excavation at the show flat
  • Geotechnical consultation and site supervision
  • Geotechnical instrumentation and interpretation

 

Hilltops Condo ar Cairhill Circle View 1

 

Hilltops Condo ar Cairhill Circle View 2