Featured Projects
Contract 9053 – Advance Earthwork at Downtown Line Depot
What we do:
Design and supervision of the TERS works (46m height open cut slope design)
JTC Underground Storage
Proposed Jurong Rock Cavern at Banyan Basin, Jurong Island.
What we do:
Provision of Project Management, Technical Advice
LTA DTL2 C921QP Little India and Rochor Station/ Tunneling works
Design and Construction of Stations and Tunnels at Rochor and Little India for Down
IR Sands at Marina Bay
Proposed Erection of the Marina Bay Sands Integrated Resort Comprising of a 3-Storey Museum, a 5-Storey Podium Complex Comprising of Mice, Casino, Theatre, Retail and Basement Carpark; and 3 Blocks of 57-Storey and 5 Basement Carpark on Lot 256A TS 30 at Bayfront Avenue
What we do:
- Design of temporary earth retaining system for 5 basement excavations
- Geotechnical consultation and site supervision during basement excavations
- Geotechnical instrumentation and interpretation